bed building and [as always] getting distracted.

It's time to finally start updating again. Sadly, these updates are going to be 4-5 months old as we slowly catch you up on our progress and post photos from our glorious fall road trip.

One of the biggest and most important projects we needed to finish before hitting the road last fall was the bed. As fun as it was to sleep on the floor and/or hang from the grab bars in a hammock, we wanted to have a proper sleeping area for what was soon to be a month+ on the road.

We'd already done a preliminary dark stain on the wood, but still had some cuts to make to allow room for it to open and fold out once hinged into place.

Christian restaining the edges of the newly cut pieces.

Christian restaining the edges of the newly cut pieces.

Putting a gloss coat on.

Putting a gloss coat on.

Not surprisingly, while escaping the heat to take some measurements, draw some diagrams and let the newest coat of sealant dry on the bed, Christian spotted another element of the interior that he decided needing some adjustment.

It's amazing what happens when you're just sitting in the Campbulance looking around. Every tiny little project seems to bare its ugly face and convince you of its immediate need for attention. In no way did the electric panel need to be addressed at this time, but alas, that's just how things go, so attend to the electric panel we did.

It turned out to be more than just a little hassle to remove it.

It turned out to be more than just a little hassle to remove it.

Meanwhile, I was measuring the back interior wall that butts up to the cab to prep for installing the peg board we had in mind.

Meanwhile, I was measuring the back interior wall that butts up to the cab to prep for installing the peg board we had in mind.

A new cubby created and a reinstalled electric panel! (Only took a few hours.)

A new cubby created and a reinstalled electric panel! (Only took a few hours.)

Our bed wasn't fully installed on this day, which probably isn't surprising given our lack of attention spans, but at least we got the bulk of the work done in prep for it.

Coming up...kitchen, counter, sink install and running water!